On October the 10th 2017 the official earth works began of Europé´s newest airport

December 2018

Brett Weihart, CEO and Lars Nilsson, acting operational manager at Scandinavian Mountains Airport, inspect the place where the air traffic control is now being built up at RTC in Sundsvall
South of the runway
As the first airport in the world, we are building an airport without a tower, but the air traffic control is operated from RTC in Sundsvall. This is the only place in the world where you can see two airplanes at the same time.
Sunset over the terminal and garage
Lucia celebration
Merry Christmas & Happy New Year - looking forward to the opening in December 2019

November 2018

A cold afternoon in the sunset
Casting of the floor in the garage
Aeration ditch
Roof party in the terminal

October 2018

Casting of the floor in the terminal has begun
Dronning image from 181011, taken from the southern end of the runway
The doors of the garage have begun to be installed
Image from 181011, taken from southwest

September 2018

View from the terminal entrance towards Rörbäcksnäs
Airport terminal
Pavement work begins

August 2018

Inside the terminal
Maintenace buildings taking shape
Inside the terminal looking towards Rörbäcksnäs
Maintenace buildings taking shape
The runway from the north

July 2018

Earthworks for the terminal and maintenance building
Earthworks for the terminal and maintenance building

June 2018

The beginnings of the terminal and maintenance buildings

Spring 2018

Southern end of the runway looking north
Heavy equipment for earth works
Earthworks for the terminal and maintenance building

Winter 2017

Dumpers
Work on the runway begins
A spring morning
Ongoing earthworks
Bulldozers, D10 och D8 at work
Dumpers
Ongoing earthworks
Early morning view over the runway
Drainage pipes for the southern part of the field
Excavator in action
Runway from the south